Portfolio
Kupang 5 MWp PLTS Energy Monitoring System

Scope of work: New SCADA installation for energy monitoring and reporting System integration with existing Power Meter and Solar Inverter Cluster Controller Technology: Advantech WebAcces

Kiln Production SCADA Migration and System Integration

Scope of work: Migration of obsolete SCADA for PT. KMP Kiln & Dryer Production Line Installation of data acquisition PLC for Kiln & Dryer Irregular Line System integration with OPC/DDE server

Sarulla Geothermal Drilling Rig Power and Control System Upgrade

Scope of work: Power System Analysis using Power Quality Analyzer Comprehensive SCR system maintenance and service Repair of DC drive (SCR) which kept tripping during operation

Pharmaceutical Waste Treatment Plant Control Panel

Application New WWTP for pharmaceutical plant Complete process from intake, coagulation, flocculation, aeration, and clarifier Motrol control center and PH-meter Scope of work WWTP cont

Borax Waste Treatment Plant Control Panel

Application New WWTP for pharmaceutical plant Complete process from intake, coagulation, flocculation, aeration, and clarifier Motrol control center and PH-meter Scope of work WWTP cont

Acid Pickling Rinse Control Panel

Application New WWTP facility for expansion factory of steel manufacturer Complete process from waste intake up to clean water Treatment capacity 300 m3/day Scope of work WWTP control p