Project Description
Treatment Application
- New WWTP for pharmaceutical plant.
- Complete process from intake, coagulation, flocculation, aeration, and clarifier.
- Motrol control center and PH-meter.
Pharmaceutical Waste Scope of work
- WWTP control panel design and engineering. PLC and HMI programming.
- Control panel fabrication.
- Installation and commissioning supervision for Pharmaceutical Waste Treatment
Technology
- Schneider Twido PLC
- Programming with TwidoSuite 2.3
- Wiring diagram drafting with Eplan Electric P8
LOCATION
Klaten, Jawa Tengah
END CLIENT
Dion Farma Abadi
PROJECT YEAR
2011