Project Description
Syntek, together with @arunapv_id, completed the installation project of a 472 kWp Rooftop Solar Power Plant (PLTS) in Batam City in September 2021. This PLTS,
consisting of 1,180 PV modules, was integrated into the roof of an existing Gas Engine Power Plant building and is expected to significantly reduce electricity
consumption, especially the auxiliary load of the power plant.
In addition to providing electricity savings, this solar panel array also contributes to reducing carbon emissions by 564,389 kg CO2
during the operation period of the Rooftop PLTS system.
Syntek is the best EPC partner for manufacturers looking to transition to solar panels to utilize renewable energy
and create environmentally friendly industrial areas in Indonesia. 🌳☀️
LOCATION
Batam
CLIENT
PT Aruna Cahaya Pratama
PROJECT DURATION
2023