Project Description
Implementation of RTU-Based FDIR System in Disjaya’s 20 kV Distribution Network
In this pilot project, Syntek collaborates with the SCADATEL PLN UP2D Jakarta Raya team in developing and implementing the FDIR (Fault Detection, Isolation, and Recovery) system at a 20 kV distribution substation in the Ciledug area. This system consists of five RTU (Remote Terminal Unit) units that communicate with each other through the 4G internet network. At each substation there is a fault detector unit that is able to detect overcurrent disturbances and ground faults.
With this FDIR system, the power supply is able to recover automatically without operator interference in less than 20 seconds after the occurrence of a power outage due to interference.
Syntek Energy & Control is very proud to always be given trust by PLN Disjaya in designing, installing, up to commissioning scadatel devices for better network reliability.
LOCATION
Jakarta
CLIENT
PT PLN (Persero)
PROJECT DURATION
2022