Project Description
Syntek Energy & Control has been tasked by PT PLN (Persero) to integrate SCADA systems at 9 Gardu Induk (substation) with 150 kV in the Central Sumatra region.
The Remote Terminal Unit (RTU) was successfully installed in July 2023 and has enhanced the reliability of the 20 kV distribution network.
With the installation of these facilities, PLN UP2B Sumbagteng is capable of responding quickly to handle and restore power outages caused by disturbances,
ensuring that power outages due to disruptions do not last long.
Syntek Energy & Control is proud to consistently be entrusted by PT PLN (Persero) in designing, installing,
and commissioning SCADA devices for better network reliability.
LOCATION
Sumbagteng
CLIENT
PLN
PROJECT DURATION
2023