Throwing it back to 2021, Syntek successfully implemented a 54 kW Smart Charging Station system at 3 gas stations [...]
Power and Data Cable Reinstallation
Fik Fik2022-05-12T08:11:09+00:00The electrical and communication system is a vital infrastructure in banking operations, therefore Bank Rakyat Indonesia (BRI) always maintains [...]

Control System Upgrade For Waste Water Treatment Plant
Fik Fik2022-04-28T07:16:26+00:00PT Mega Pratama Ferindo as one of the largest steel wire & bar manufacturers in Tangerang, always maintains the [...]

Substation Feeder Integration to SCADA UP2D Banten
Fik Fik2022-04-28T06:56:13+00:00The success of the Syntek project with PT PLN (Persero) UP2D Disbanten since 2019 gave a good impression, this [...]

Substation Integration to SCADA UP2D Banten
Fik Fik2022-04-28T06:48:13+00:00Along with the increase in the number of distribution assets owned by PLN so that it needs to be [...]

Substation Integration to SCADA UP2D Riau
Fik Fik2022-04-28T06:31:43+00:00PLN again appointed Syntek for Scadanization work in 12 Substation locations spread across the Riau islands. Syntek provides RTU [...]

Electrical Panels for EPI Porta-Camp
Fik Fik2021-03-24T11:45:12+00:00Syntek delivered 5 sets of LVMDP for PT Exspan Petrogas Intranusa, to supports their geothermal drilling rig operation in [...]