Along with the increase in the number of distribution assets owned by PLN so that it needs to be [...]

Substation Integration to SCADA UP2D Riau
Fik Fik2022-04-28T06:31:43+00:00PLN again appointed Syntek for Scadanization work in 12 Substation locations spread across the Riau islands. Syntek provides RTU [...]

PLC & Electrical Panel IPAL Balongan
restu hanggara2021-02-19T09:01:45+00:00PT Pertamina (Persero) Refinery Unit VI Balongan is one of the oil and gas industries that plays a major [...]

SEI Mangkei Biogas SCADA
restu hanggara2021-02-19T09:05:02+00:00Biogas is one of the most potential renewable energy sources in Indonesia. It is because the raw materials needed [...]

Polimerization Plant Instrumentation & Control System
restu hanggara2021-02-19T09:04:07+00:00A leading chemical manufacturer in Indonesia faces a challenge in Polymerization. Polymerization, a process in which small molecules combine [...]

55 kW 360 kWh Derawan Hybrid Battery Integration
restu hanggara2022-05-18T06:14:58+00:00Derawan Island is known as an exotic island and becomes a tourist destination that has been widely known. In [...]

Harmand Drilling Rig HMI & PLC Upgrade
restu hanggara2021-03-24T11:09:04+00:00To increase the reliability of its geothermal drilling rig, Syntek performed upgrade of its SCR Room HMI as well [...]

PDAM Banjarmasin Intake Pump Monitoring
Fik Fik2021-03-25T04:10:37+00:00With an additional Intake pump monitoring station in Sungai Tabuk, PDAM Banjarmasin can increase its water treatment capacity. To [...]
TKCM WTP PLC Migration
Fik Fik2021-01-25T05:07:54+00:00Syntek migrated Tirta Kencana (TKCM) WTP PLC from Siemens S7 to Honeywell HC900. The units control water filtration and [...]

Automation Panel & MCC for Process Control
Fik Fik2022-05-18T03:36:39+00:00The Motor Control Center (MCC) panel is a system used to regulate the operation of industrial motors. In 2018, [...]