Project Description
In collaboration with Xurya, Syntek has successfully completed the installation of a 6 MWp rooftop solar power system at an FMCG company located in Karawang, West Java. This on-grid solar PV system, consisting of 13,240 PV modules, is projected to generate an additional 8,355 MWh of electricity annually, enabling more efficient daytime energy usage.
Beyond reducing PLN electricity costs, this solar panel system also contributes to cutting carbon emissions by 6,517 tons of CO2 per year. This achievement is in line with the company’s commitment to adopting green energy for the realization of an environmentally friendly industry.
Syntek stands as the trusted EPC partner for manufacturers seeking to transition to solar energy, driving renewable energy adoption and fostering sustainable industrial zones in Indonesia.
LOCATION
Jawa Barat
CLIENT
Xurya
PROJECT DURATION
2024