Project Description
PT Mega Pratama Ferindo as one of the largest steel wire & bar manufacturers in Tangerang, always maintains the operation of the WasteWater Treatment Plant (WWTP) owned so that the waste dumped is always safe for the environment. In 2020, Syntek Energy & Control helped PT MPF to migrate outdated existing control systems to newer systems using Schneider PLC & HMI.
With this upgrade and re-commissioning, operators can run WWTP normally so that the plant is able to produce the expected waste quality and in accordance with the K3L method.
Syntek has been trusted in providing engineering, installation, and commissioning services for automation systems, both upgrades and new. We can also customize the PLC brand according to the needs and preferences of each customer.
LOCATION
Tangerang, Banten
CLIENT
PT Mega Pratama Ferindo
PROJECT DURATION
2020