Delivering a reliable telecontrol solution in 6 PLN UP2D Riau substation with limited mobilization due to pandemic was definitely challenging. Thankfully, our brave team was up to the task!
The deployed system enables PLN Master Scada to control 20 kV switchgears as well as read measurement and disturbance status.
This marked the completion of SAE IT-systems GmbH & Co. KG FW-50 RTU first batch entry in Indonesian market. With intuitive and user-friendly configuration software, the commissioning phase went smoothly and the system is up and running in no time!
LOCATION
Riau
CLIENT
PT PLN (Persero)
PROJECT DURATION
2020