Project Description
Application
- New WWTP facility for expansion factory of steel manufacturer
- Complete process from waste intake up to clean water
- Treatment capacity 300 m3/day
Scope of work
- WWTP control panel design and engineering
- PLC and HMI programming
- Control panel fabrication
- Installation and commissioning supervision
Acid Pickling Technology
- Schneider Twido PLC
- Schneider New Magelis HMI (2013 product)
- Programming with TwidoSuite 2.3 and Vijeo Designer 6
- Wiring diagram drafting with Eplan Electric P8
LOCATION
Jatake, Tangerang
END CLIENT
Mega Pratama Ferindo
PROJECT YEAR
2013