3 MWp On-Grid PV Plant in 10 Locations Operation, Preventive Maintenance and Corrective Maintenance

//3 MWp On-Grid PV Plant in 10 Locations Operation, Preventive Maintenance and Corrective Maintenance
3 MWp On-Grid PV Plant in 10 Locations Operation, Preventive Maintenance and Corrective Maintenance2021-09-23T12:42:31+00:00

Project Description

As the market leader for PLTS O&M in Indonesia, we collaborate with Surya Utama Nuansa to operate and maintain PLTS 0n-Grid 3 MWp in Java.

 

These preventive and corrective maintenance activities can run optimally, and PV performance is always in good and efficient condition. Keeping the PLTS in the best performance based on the performance ratio and availability ratio, the revenue from the PLTS will be consistently high.

 

Through alertness and good coordination and still complying with the Covid19 protocol at work, we handle work in 10 different locations, including:

Astra Honda 1 (183.6 kWp)

Astra Honda 3 (1227 kWp)

Q-Big Mall (780 kWp)

Sinarmas Land MO (157 kWp)

Sinarmas Land CC (75 kWp)

Graha Unilever (199 kWp)

Techno Workshop (46 kWp)

Astra Honda Training Center (300.56 kWp)

Bank Sinarmas Klampis – Surabaya (7.48 kWp)

Bank Sinarmas Dipenogoro – Surabaya (22.4 kWp)

 

Syntek provides professional and reliable personnel in operation and maintenance of power plants. Syntek’s contribution in process, preventive and corrective maintenance is one of our concrete steps to continue to be committed to realizing a cleaner, greener, and healthier future for the earth.

LOCATION

Multiple Site in Jabodetabek

CLIENT

Private Company

PROJECT DURATION

2020

Project Details

Categories:

WhatsApp chat