Project Description
Installation of SCADA Facilities at the Aur Duri Substation in Jambi Region
In this work, Syntek Energy & Control presents a telecontrol solution at the PLN Aur Duri Substation (GI) in the Jambi region, South Sumatra. We implemented the SCADA system on S2JB GI Aur Duri which is capable of operating 24/7 to control the distribution of 20 kV medium voltage electricity to customers, as well as monitor the status of interference from the Dispatch Center.
With the installation of this system, PLN is able to act quickly in handling and recovering power outages due to disturbances so that the outages caused by these disturbances do not last long.
Through various work experiences in the SCADA field, this project can be completed with the best quality and on time. We are very proud to continue to cooperate with PLN in designing, installing, and commissioning scadatel devices.
LOCATION
Jambi
CLIENT
PT PLN (Persero)
PROJECT DURATION
2021