Project Description
Syntek Energy & Control, commissioned by PT PLN (Persero), has successfully completed a significant project in integrating 12 isolated Substations to the SCADA system in Palu, Boeol, Seluang, and other areas scattered across Suluttenggo. In December 2023, the Syntek team successfully installed Remote Terminal Units (RTUs), which have made a significant contribution to enhancing the reliability of the 20kV distribution network.
With this facility, PLN UP2D Suluttenggo now has the capability to respond quickly to and restore power disturbances, ensuring that outages can be efficiently addressed. The success of this integration provides PLN UP2D Suluttenggo with an advantage in managing and maintaining the electrical infrastructure in the Suluttenggo region.
LOCATION
Suluttenggo
CLIENT
PLN
PROJECT DURATION
2023