Project Description
Syntek Energy & Control has proudly contributed to the development of the Technopark Pulau Rengit Solar PV project, a pioneering microgrid established as a “living lab” in the Bangka Belitung Islands. Designed to integrate renewable energy technologies to meet local community power demands, this project is a vital component of an integrated green energy ecosystem, aligning seamlessly with Indonesiaβs national agenda to accelerate Solar PV development up to 100 GWp.
Advanced Integration of Renewable Assets and Energy Storage
In this project, Syntek played a central role in the supply and seamless integration of the Solar PV system, Battery Energy Storage System (BESS), and an advanced Energy Management System (EMS). Our tailored solution dynamically optimizes the coordination between power generation sources, energy storage, and load demands within a unified microgrid ecosystem. Building upon the Green Hydrogen House initiative, the system delivers reliable renewable electricity by integrating PV, BESS, and hydrogen technology, thereby minimizing the reliance on backup diesel generators. Furthermore, the microgrid is designed with future scalability in mind, including planned integrations for wind energy resources.
Empowering Remote Communities with 24/7 Clean Energy
The implementation of this microgrid delivers a profound and direct impact on the residents of Pulau Rengit. Previously limited to approximately 12 hours of electricity per day, the community now enjoys a reliable 24-hour power supply while significantly reducing its dependency on costly diesel fuel. This integrated microgrid model demonstrates immense potential for replication across other archipelagos and remote islands that urgently require independent, dependable, and sustainable energy access.
Syntekβs Commitment to Intelligent Energy Solutions
This milestone further solidifies Syntek Energy & Controlβs proven capability in delivering advanced automation, control, renewable energy integration, and intelligent energy management solutions. We remain steadfast in our commitment to empowering communities through innovative engineering and actively supporting the acceleration of Indonesiaβs clean energy transition.
LOCATION
Bangka Belitung
CLIENT
PLN
PROJECT DURATION
2026