PLTM Silau Water Monitoring & System Integration

//PLTM Silau Water Monitoring & System Integration
PLTM Silau Water Monitoring & System Integration2025-11-14T07:46:18+00:00

Project Description

Application:

    Water level (weir, waterway, and headpond) and penstock flow rate measurement for Pelton-type hydro turbine (2×4,1 MW) efficiency assessment

Scope of work includes procurement, installation, and commissioning of:

  • Flowmeter, level transmitter, and rain bucket
  • SCADA modification
  • Fiber optic installation, splicing, and OTDR

Technology:

  • Cimplicity 7.2 SCADA with Modbus TCP
  • ICPDas RTU and media converter
  • Analog 4..20mA 2-wire and 4-wire transmitter
  • Ultrasonic level and flow transducer

LOCATION

Simalungun, Sumatera Utara

END CLIENT

Tamaris Hydro

PROJECT YEAR

2016