Project Description
Syntek Energy & Control, in collaboration with PLN Icon+, has been entrusted to support the strengthening of renewable energy infrastructure in Papua’s 3T (Frontier, Outermost, and Disadvantaged) regions through the development of an Off-Grid PLTS Monitoring System and the establishment of a Centralized Monitoring Dashboard for PLN UIW Papua.
In this project, Syntek installed monitoring systems across several Off-Grid PLTS sites located throughout the Raja Ampat Islands: Beo, Waifoi, Warimak, Solal, and Solol. All operational data from each site is integrated into a single centralized dashboard that can be accessed in real time.
The dashboard is designed to provide full visibility into equipment conditions, energy production, and the operational status of each Off-Grid PLTS. An alarm notification feature enables the PLN team to receive immediate alerts in the event of anomalies or potential system failures.
This implementation marks an important step in improving the reliability of energy supply in remote regions, while also streamlining monitoring and maintenance processes for PLN UIW Papua. With the centralized monitoring system in place, the management of Off-Grid PLTS can now be carried out more quickly, efficiently, and with measurable performance.
LOCATION
Papua
CLIENT
PLN Icon+
PROJECT DURATION
2025