Project Description
Previously, Solar Power Plant in Semau had not been fully utilized because the battery system as energy storage was not installed. Therefore, the energy produced by Solar Power Plant is not stored and can only be used during the day. When the electricity load increases, the existing Diesel Power Plant can not take over the electricity supply because it has not been integrated with the Solar Power Plant.
Syntek Solar has successfully supports PLN through the procurement and installation of the Smart Grid System. This Smart Grid system can integrate PV, battery and Diesel Plant systems reliably and optimally. All migrations and transitions can be done automatically without network problems.
LOCATION
Semau Island, East Nusa Tenggara
CLIENT
PT PLN (Persero)
PROJECT DURATION
2020