Project Description
PT PLN (Persero) UP2D West Kalimantan gave Syntek Energy & Control the trust to integrate GI GH in 7 locations spread out with the SCADA UP2D KALBAR system. The RTU system has been successfully installed in November 2022 and is capable of operating 24/7 to control the distribution of 20 kV medium voltage electricity to customers.
With this system installed, PLN UP2D Kalbar can act quickly in handling and restoring power outages (black out) due to disturbances. Even though the project locations are at a far apart point, Syntek can complete the project on time according to the timeline that has been created. The user’s investment budget can also be absorbed optimally.
Through sufficient experience in telecontrol work as well as certified manpower according to the work provided, this project can be completed by Team Syntek with the best quality. Syntek Energy & Control is very proud to always be given trust by PLN in designing, installing, and commissioning scadatel devices for better service to the public.
LOCATION
West Kalimantan
CLIENT
PT PLN (Persero)
PROJECT DURATION
2022