Addition of Lagoon Pump Control System for Biogas Power Plant (PLTBg) in Riau Islands

//Addition of Lagoon Pump Control System for Biogas Power Plant (PLTBg) in Riau Islands
Addition of Lagoon Pump Control System for Biogas Power Plant (PLTBg) in Riau Islands2022-10-14T07:49:47+00:00

Project Description

Syntek Energy & Control again had the opportunity to participate in the provision of a control and monitoring system for the Biogas Power Plant (PLTBg) located in the Riau Islands. This project is expected to improve the reliability of the electricity network in the Riau Islands and can reduce diesel fuel consumption at the Riau Islands PLTD.

The addition of this lagoon pump aims to increase the supply of biogas to the PLTBg so that its generation can be more stable. Each lagoon pump is controlled by PLC and HMI panels so that the pump can run automatically as needed for pressure in the intake pipe to the biogas machine.

In addition to being one of the main alternative energy for the People of Indonesia in the future, biogas can also be one of the efforts to protect the earth from global warming. Syntek supports the government’s efforts in achieving the target of Biogas Power Plants (PLTBg) to reach 5.5 GW by 2025.

LOCATION

Kepulauan Riau

CLIENT

Private Company

PROJECT DURATION

2022

Project Details

WhatsApp chat