Solar PV & Diesel Generator Hybrid System in Selayar

/, Remote Monitoring & Control, Renewable Energy/Solar PV & Diesel Generator Hybrid System in Selayar
Solar PV & Diesel Generator Hybrid System in Selayar2022-08-18T02:02:17+00:00

Project Description

PLTS Hybrid Selayar 1.3 MWp with the largest capacity in Indonesia

Syntek together with PT Bakrie Power and PT Dipa Jaya Sejahtera have successfully integrated the Hybrid Solar Power Plant system located in Parak Village, Bontomanai District, Selayar Regency. The 1.3 MWp Hybrid Solar Power Plant is currently PLN’s largest solar power plant with the largest capacity in Indonesia.

The new renewable energy plant with a hybrid system integrates solar power plants, Battery Energy Storage System (BESS), and Diesel Generators using RTU and SCADA-based automation systems in carrying out Power Balancing and System Stabilization. With the strict Automatic Control of the Hybrid Solar Power Plant, the people of Selayar Island can enjoy cleaner energy, while maintaining the reliability and stability of the network.

Syntek Energy & Control is very proud to be able to provide complex engineering solutions by integrating hybrid PV systems into PLN’s existing network. We will always support the government in its efforts to increase the penetration of clean energy by building new and renewable energy (EBT) based power plants in Indonesia.

LOCATION

Kabupaten Selayar, Sulawesi Selatan

CLIENT

PT PLN (Persero)

PROJECT DURATION

2022