Project Description
In this project, Syntek Energy & Control provided telecontrol solutions for 6 Main Substations (GI) 20 kV owned by PLN UP2D Aceh.
The RTU system was successfully installed in February 2023 and operates 24/7 to control the distribution of medium voltage electrical networks and
monitor fault statuses from the Dispatch Control Center.
With the installation of this facility, PLN UP2D Aceh is able to respond quickly to handle and restore power outages caused by faults,
ensuring that outages caused by such faults do not last long.
Syntek consistently completes projects with the highest quality and within deadlines, demonstrating that PT.PLN (Persero)
always trusts us to design, install, and commission SCADA devices for better public service.
LOCATION
Aceh
CLIENT
PLN
PROJECT DURATION
2023