Substation Integration To SCADA UP2D Suluttenggo

/, Remote Monitoring & Control/Substation Integration To SCADA UP2D Suluttenggo
Substation Integration To SCADA UP2D Suluttenggo2024-05-02T04:17:36+00:00

Project Description

Syntek Energy & Control has been tasked by PT PLN (Persero) to integrate SCADA systems into the Extension Feeder Bays
at Main Substations (GI) for the PLN UP2D SULUTTENGGO area. The Remote Terminal Unit (RTU) was successfully installed in February 2023,
enhancing the reliability of the 20kV distribution network in 3 Main Substations in Sulawesi: GI Sidera, GI Parigi, and GI Talise.

With the installation of SCADA, PLN operators or maintenance teams can remotely and in real-time review and control
the operation of feeder bays from the Master Terminal Unit (MTU) interface on the SCADA system. PLN UP2D SULUTTENGGO can respond swiftly
to handle and restore power outages caused by disruptions.

Syntek Energy & Control takes great pride in consistently being entrusted by PLN to design, install, and commission SCADA devices for enhanced network reliability.

LOCATION

Suluttenggo

CLIENT

PLN

PROJECT DURATION

2023