Project Description
The intermittency characteristic of a PV plant production always poses a challenge for implementation in remote area where the power grid is relatively weak due to a number of small generators. One of the way to increase renewable energy penetration is by implementing a hybrid PV-battery system. Syntek supplied a PLC control panel to switch inverter operation from off-grid to on-grid (exporting power to grid) in a scheduled manner together with inverters from Surya Energi Indotama. The systems were deployed in Lemang and Teluk Samak, Meranti Islands, Riau province.
LOCATION
Riau
END CLIENT
Surya Energi Indotama
PROJECT DURATION
2018