Badak LNG PV Plant SCADA

/, Renewable Energy/Badak LNG PV Plant SCADA
Badak LNG PV Plant SCADA2021-01-25T04:14:34+00:00

Project Description

Pertamina Power Indonesia (PPI) made a PPA (Power Purchase Agreement) with Badak LNG Bontang in an effort to reduce the plant carbon footprint. Integrated into their own power grid, knowing the status in real-time and being able to control the inverters are mandatory.  And than, With our web-based SCADA and remote IO, Badak operator can monitor and control the plant from within their control room. The system, supplied with a secure VPN link, enables PPI to see the operation dashboard in real-time from their office in Jakarta.

LOCATION

Jakarta

END CLIENT

Pertamina Power Indonesia

PROJECT DURATION

2019

Project Details

WhatsApp chat