Project Description
PLTM Tomasa is a micro hydro power plant located in Poso, Central Sulawesi. The long distance between the tranquilizer tub (headpond) and the power house makes it difficult for pltm operators to monitor water levels and operate floodgates to maintain the height at optimal limits.
To improve the performance of pltm, a reliable control and automation system is needed and integrated with the plant control center. With this system, floodgate control can be done centrally and assist operators in maintaining plant operations.
Through adequate experience in the field of automation & control in various PLTM / PLTA in Indonesia, we have been trusted to build a reliable, real time, and easily accessible Tomasa PLTM monitoring system. Syntek Energy & Control is always ready to be committed to helping increase the use of new renewable energy in Indonesia.
LOCATION
Poso, Sulawesi Tengah
CLIENT
Arkora Hydro
PROJECT DURATION
2020